|
|
Coronado Paint Company
| Location: |
Volusia County, Florida |

|
| Client: |
Complementary Coatings |
| Need: |
Client required assessment and remediation of soil and groundwater resulting from the release of materials used in the manufacturing of paints and coatings. |
| Scope: |
- Assess site in accordance with Rule 62-780.600, F.A.C.
- Implement remedial measures, including soil excavation, solidification/stabilization, soil vapor extraction (SVE), groundwater pump-and-treat, and biosparging.
- Solidification/stabilization included the use of a solar evaporation system to reclaim hazardous waste for use as raw manufacturing material for a commercial coating product, offering a considerable savings versus waste disposal.
- Site Rehabilitation Completion Order issued by FDEP.
- Additional, turnkey services included RCRA, CERCLA, and OSHA compliance, including nuisance dust, noise level, and indoor air quality testing.
|
Tags: Closure Assessment, Contamination, Groundwater Modeling, Indoor Air Quality, Industrial, Noise, Phase I and II Environmental Site Assessment, Remediation, Site Assessment, SPCC Plan
|
|