Projects


A representative sampling of our ongoing and completed projects have been organized by type; please choose from a project category below:

Agricultural Methane Consulting
Contamination
Energy
Engineering
Landfill / Solid Waste Engineering
Litigation Support
Mining
Property & Developer Services
Waste Processing & Recycling
Water Supply & Hydrogeology

Desoto C&D Debris Disposal Facility Landfill

Location: DeSoto County, Florida

Client: WCA of Florida
Need: Groundwater quality monitoring identified the presence of increasing arsenic concentrations within groundwater. FDEP required the preparation of an Evaluation Monitoring Report, Site Assessment, and Corrective Action Plan to address this issue.
Scope:
  • Perform limited historical site land use assessment with historical aerial photographs and maps for source of arsenic.
  • Utilize rotary and Geoprobe drilling rigs to collect soil samples and install monitoring wells.
  • Collect soil and groundwater quality samples pursuant to FDEP SOPs.
  • Perform slug testing to calculate groundwater seepage velocities.
  • Conduct area survey for wells and potential pollution sources.
  • Prepare a report fully documenting investigative methods, results and conclusions regarding site conditions pursuant to FDEP Rules 62-701 and 62-780, F.A.C.
  • Evaluation and Site Assessment reports showed that reductive dissolution, or the “shadow effect” was the primary cause of arsenic groundwater contamination.
  • Monitored Natural Attenuation recommended in lieu of active remediation.
Tags: , , , ,
SERVICES
We offer an extensive suite of environmental and engineering services.
» MORE
CLIENTS
Our portfolio includes both public and private sector clients.
» MORE
PROJECTS
Check out our innovative solutions provided on time and on budget.
» MORE
NEWS
Click here for the latest news from HSA Golden.
» MORE
HOME ABOUT US SERVICES CLIENTS PROJECTS NEWS CAREERS CONTACT US

© COPYRIGHT 2012 HSA Golden | Environmental and Engineering Consultants in Orlando, Florida